togetherwe achievemore

Notification of works- Estuary Drive level crossing

newsroom

WORKS UPDATE 29.05.2017

Notification of works- Estuary Drive level crossing

Brookfield Rail wishes to advise Estuary Drive in Bunbury will be closed for level crossing works.

Notification of works- Estuary Drive level crossing  teaser

The works involve cutting of asphalt, and replacement of sleepers, rail, ballast and asphalt.

Details are as follows:

• From 6am to 5pm on Wednesday 7th June the road will be under two way traffic control (stop/slow) with a speed restriction of 40km/h.
• From 6am to 5pm on Thursday 8th June the road will be closed and traffic will be detoured via an alternate route

The detour will utilise Willinge Drive, Australind Bypass and Old Coast Road. We ask that motorists take this into account for any travel plans during these times, and apologise for any inconvenience caused.

For further information please contact Project Engineer Simon Topp on 0428 566 124.

Contact

Hannah Jenkins
Corporate Affairs Advisor
Phone: 0447 881 852
Email: hannah.jenkins@arcinfra.com 
    

 

Back To News Stories


connect with us

never miss a story. get the latest news in your inbox

Message
 
Go Up