Arc Infrastructure is undertaking essential maintenance works on the rail network in the Mid West Region at the Mogumber Road West / Bindoon- Moora Road level crossing from 23 September to 25 September 2025.
The works will require a temporary closure of the level crossing and the roads to the west of the rail crossing on Mogumber Road West between the hours of 7am and 6pm. Outside of these hours the road shall be reopened with a 40km/h speed restriction due to the road/rail crossing surface condition.
Local traffic only will be permitted to enter Mogumber Road West from the intersection of Brand Highway. All other motorists will be diverted to either the level crossing in Gillingarra or Wannamal. Please note the extended time required for these detours.
The works will include the removal and replacement of the track and the upgrading of associated infrastructure.

All practical efforts have been made to minimise disturbance to the surrounding residents and the wider community. Please follow all traffic management signage and directions during the works period.
The detours are as follows for light vehicles:
-
Bindoon-Moora Road (Northbound) - Detoured via Gillingarra Road -> Dandaragan Road -> Brand Highway
-
Bindoon-Moora Road (Southbound) - Detoured via Wannamal Road West -> Brand Highway
-
Brand Highway (Northbound) - Detoured via Dandaragan Road -> Gillingarra Road -> Bindoon-Moora Road
-
Brand Highway (Southbound) - Detoured via Wannamal Road West -> Bindoon-Moora Road
-
Mogumber-Yarawindah Road (Westbound) - Detoured via -> Bindoon-Moora Road -> Gillingarra Road -> Dandaragan Road -> Brand Highway
-
Red Gully Road, Clarke Road, Fynes Road (Accessing Mogumber Road West) - Unable to travel East and access Bindoon-Moora Road, traffic to be detoured via Brand Highway -> Dandaragan Road -> Gillingarra Road -> Bindoon-Moora Road.
Heavy vehicle operators will be referred to the RAV Mapping Tool to make their decision on how they will travel around the detour.
These works are part of Arc’s investment in the rail network in the Mid West and will ensure the integrity and safety of the State’s freight rail network, a critical piece of infrastructure for the ongoing development and growth of our economy and communities.
Arc Infrastructure is committed to keeping the community informed of works occurring in your region. We appreciate your patience during these works and apologise in advance for any inconvenience.
Should you have any questions or concerns regarding the work please contact communications@arcinfra.com or call Trevor Blackmore Regional Lead Mid West on 0408 698 304.
Back To News Stories