As a result of continuous improvement Arc Infrastructure will release the following updated Rules and Procedures: 1004 - Track Access Accreditation, 2007 - Network Communication, 3005 - Work on Track Authority, 4009 - Removing Disabled Rail Traffic, 4013 - Shunting and Marshalling, 5017 - Train Order Working, 6005 - Fixed Signals, 9006 - Piloting Rail Traffic, 9026 - Annett's Keys (all date effective 01 07 2026). The WoTA Issue and Receipt forms have been updated and must be used from the effective date shown.
WoTA Issuance Steps
A new guide for the updated WoTA forms will apply to both Network Controllers and Protection Officers. It outlines the required steps to ensure consistency and to prevent situations where in the Train Control System (TCS) the applied blocking differs from those nominated by the Protection Officer on the WoTA form.
Safety Directive Network Safeworking Rules and Procedures Update November 2025.pdf
As a result of continuous improvement Arc Infrastructure will release the following updated Rules and Procedures:
Rule 1001 Scope of the Network Safeworking Rules (date effective 03 11 2025), Rule 1004 Track Access Accreditation (date effective 03 11 2025), Rule 2007 Network Communications (date effective 03 11 2025), Rule 2009 Responsibilities of Network Controllers (date effective 03 11 2025), Rule 2029 Reporting and Responding to a CAN (date effective 03 11 2025), Rule 5017 Train Order Working (date effective 03 11 2025), Procedure 9006 Piloting Rail Traffic (date effective 03 11 2025), Network Safeworking Rules and Procedures – Glossary (date effective 03 11 2025).
Safety Directive Rule 1001 Scope of Network Safeworking Rules Update June 2025.pdf
Section 3.2 has had the Train Control boundaries map updated due to the Avon Yard to Wagin section of the GSR, becoming part of the Northern Control Boundary. Additionally Northern Control will also include the lines not in use which includes York to Quairading, Narrogin to Merredin via Corrigin and Yilliminning to Merredin via Kondinin.
Safety Directive Network Safeworking Rule 1001 Update March 2025.pdf
This advice is due to the Network Control Boundary change for the Leonora Branch Line.
Safety Directive Network Safeworking Rules Procedures Updates December 2024.pdf
As a result of continuous improvement Arc Infrastructure will release the following updated Rules and Procedures:
Rule 1004 Track Access Accreditation, Rule 2007 Network Communications, Rule 4017 Overdue Occupancies, Work on Track (Issue) and Work on Track (Receipt) Forms (date effective 01 01 2025).
Safety Advice - Online Train Running Information System Update.pdf
As part of continual improvement initiatives Arc has introduced some changes to the Train Running Information System that is accessible through the WebRAMS application.
Safety Advice - Radio Frequency Changes 2026
Arc is updating its radio networks to comply with Australian Communications and Media Authority (ACMA) regulatory changes.
Safety Advice - Work on Track Authority (WoTA) Issuance Process Steps
When issuing a WoTA, Network Controllers and Protection Officers must follow the steps below to ensure consistency and reduce the risk of blocking facilities in the Train Control System (TCS) not matching the block limits nominated by the Protection Officer on the WoTA form. Effective Date: 01/07/2026
Safety Advice - Work on Track Authority (WoTA) Work Instruction
This instruction explains the process for applying Blocking Facilities and completing Work on Track Authority forms. It applies to Competent Workers and Network Controllers who are required to complete Work on Track Authority forms.